What to clarify
before the storage order.
Grid application, quote comparison, grid fees and customer report. Answers for your customer projects.
0102030405
What you need for the grid application.
Site, operator, storage and connection: the grid connection request needs these details.
What a storage quote must include.
The battery price alone is not enough to compare quotes. What matters is which services are included up to commissioning.
What full-load hours say about your site.
Annual consumption divided by annual peak load: this figure shows how evenly a business uses its grid connection.
Lower load peaks at the right time.
With atypical grid usage, what counts is the load during the grid operator's peak-load time windows. That is a different task from shaving a short peak.
Which questions your customer report should answer.
Your customer wants to know which size fits, what it saves and how the project will be implemented.