What you need for the grid application.

Site, operator, storage and connection: the grid connection request needs these details.

System details

Record the site, the operator and the planned storage power. Existing systems and the existing connection are part of it. Changes to power or operating mode must be reflected in the documents.

Forms and supporting documents

BESSPLAN transfers project data into the application forms. Check the completed details and add the required supporting documents before you submit the application. Which documents are needed depends on the project and the grid operator.

After submission

The grid operator may request additional documents. Record the query, an owner and the due date. If you want to hand off the work, you can order the grid connection service separately.