Charging power despite a tight grid connection.
How many vehicles charge at the same time? How long are they parked? Record charging demand and connection capacity to plan the battery storage system.
Discuss a charging projectBehind the meter (BTM)

Power alone is not enough.
A storage system can absorb short charging peaks. For longer charging windows it needs enough energy and then time to recharge. Both are part of the design.
- You provide
- Charging times, energy demand, simultaneity and connection capacity
- In the project
- Charging profile, storage approach and connection documents
- Order if needed
- Sizing, metering concept and grid connection handling
- Load profile and charging demand
- Compare storage sizes
- Prepare the grid connection