Charging power despite a tight grid connection.

How many vehicles charge at the same time? How long are they parked? Record charging demand and connection capacity to plan the battery storage system.

Discuss a charging project

Behind the meter (BTM)

Charging infrastructure with battery storage at a commercial site

Power alone is not enough.

A storage system can absorb short charging peaks. For longer charging windows it needs enough energy and then time to recharge. Both are part of the design.

You provide
Charging times, energy demand, simultaneity and connection capacity
In the project
Charging profile, storage approach and connection documents
Order if needed
Sizing, metering concept and grid connection handling
  1. Load profile and charging demand
  2. Compare storage sizes
  3. Prepare the grid connection