Skip to content

The storage system has to fit the consumption.

Shave load peaks and use more of your own solar power. With your customer's load profile you compare the storage sizes that pay off.

Discuss an industrial project

Behind the meter (BTM)

Battery storage at a commercial site

What does the highest load cost?

A short load peak can set the demand charge for the whole year. The consumption curve shows how much power the storage system has to deliver and for how long.

You provide
Annual load profile, electricity bill and details of the PV system
BESSPLAN calculates
Storage sizes, savings and payback period
You receive
Option comparison and customer report as PDF or link
bessplan.de/projekt/wirtschaftlichkeit/varianten
Comparison of storage sizes and business case, example data
BESSPLAN with example data

The calculation is done. What does the grid operator need?

The chosen storage size and the system data are used for the grid application. You check the prefilled forms before submission.

View grid applications

Discuss an industrial project.

We discuss your site and show you the matching application in 30 minutes.

Book a demoCall