Speicherentscheid Deutschland. For solar and electrical contractors and planners with commercial customers in Germany.

Does your customer’s storage pay off?
Tomorrow you will know.

From the 15-minute load profile and the grid operator’s price sheet: three storage sizes, savings, payback, purchase and leasing. One working day, EUR 290 net. If no storage pays off, you pay nothing.

This is what
your customer gets.

Eight chapters, six of them here. Plastics plant example, every figure from the simulation with the real load profile.

EUR 186 per kWVoltage level, 2026 price sheet, connection capacity, 4,200 MWh per year
1.48 MW peak35,040 quarter hours as duration curve, target 880 kW
600 kW, 1,200 kWhEUR 145,000 per year, 3.0 years payback, two alternatives next to it
EUR 111,600 lessGrid fees on the day of the annual peak, utilisation hours 2,838 to 4,773
16 % energy costsEUR 814,800 today, EUR 681,000 with storage, storage costs deducted
Back after 3.0 yearsEUR 405,000 purchase or EUR 59,231 leasing per year, cash flow over 15 years

One project.
EUR 290 net.

Order, upload the load profile, the analysis is ready tomorrow. Invoice by email, no account, no subscription.

Speicherentscheid Deutschland

290,00 € net

instead of 3.650,00 € ordered separately, values estimated

  • Lastgang-Auswertung und Speicherauslegung mit drei Größen, 35.040 Viertelstunden1.600,00 €
  • Netzentgelte nach dem aktuellen Preisblatt des Netzbetreibers, Tag der Jahresspitze400,00 €
  • Ersparnis als Wasserfall und Amortisation je Speichergröße300,00 €
  • Kauf und Leasing nebeneinander, Kapitalfluss über 15 Jahre400,00 €
  • Zugang in BESSPLAN für Sie und Ihren Kunden, zwölf MonateBonus500,00 €
  • Ersteinschätzung, ob der Netzanschluss für den Speicher reichtBonus300,00 €
  • Durchsprache des Ergebnisses per TelefonBonus150,00 €
Rechnet sich kein Speicher, zahlen Sie nichts.Ergibt die Simulation für keine der drei Speichergrößen eine Ersparnis gegenüber heute, erstatten wir den vollen Betrag. Die Analyse behalten Sie trotzdem.

At most 10 analyses per working day. Fully credited if the decision package follows within 60 days.

Order Speicherentscheid

Binding order, invoice by email. You upload the load profile in the next step.

Step 1 of 2. We need the address for the invoice and the project for the analysis.

Three questions

Where do I get my customer’s load profile?

From the grid or metering operator, as CSV or Excel. Sites above roughly 100 MWh per year have the metering. We send the request text with the confirmation.

And if storage does not pay off?

If the simulation shows no savings for any of the three storage sizes, we refund the full amount. You keep the analysis.

When do I have the analysis?

Within one working day after the load profile arrives, as an analysis in BESSPLAN and as PDF. At most ten analyses per working day, first come first served.

Upload the load profile today.
The analysis is ready tomorrow.

35,040 quarter hours per analysis, price sheet of the respective grid operator, checked by an engineer. Scale Energy, operator and planner of battery storage for industrial sites. Scope and terms (9 items).