Battery storage for plastics processing.

Heating up, start-up and simultaneous operation of several lines can determine the highest grid load. The load profile shows how long this load lasts.

See a load profile in the demo
Battery storage at a commercial site

Several production lines, one load peak.

  • When do the production lines start?
  • Which peaks arise from simultaneous operation?
  • Which charging windows remain in shift operation?

For the calculation

Annual load profile, shift and start-up times, electricity costs and connection data.

The result

Three storage sizes compared by savings and payback. The selected option becomes the customer report as a PDF or link.

Explore the calculation

Planning for a specific business?

Bring your questions. We show the storage comparison and the customer report with an example.