Battery storage for plastics processing.
Heating up, start-up and simultaneous operation of several lines can determine the highest grid load. The load profile shows how long this load lasts.
See a load profile in the demo
Several production lines, one load peak.
- When do the production lines start?
- Which peaks arise from simultaneous operation?
- Which charging windows remain in shift operation?
For the calculation
Annual load profile, shift and start-up times, electricity costs and connection data.
The result
Three storage sizes compared by savings and payback. The selected option becomes the customer report as a PDF or link.
Explore the calculationPlanning for a specific business?
Bring your questions. We show the storage comparison and the customer report with an example.